Template:RiskAssessment/Bunfight: Difference between revisions
From SUWS-wiki
No edit summary |
No edit summary |
||
Line 4: | Line 4: | ||
{{RiskAssessment/Columns}} | {{RiskAssessment/Columns}} | ||
</noinclude> | </noinclude> | ||
! colspan=5 | Bunfight-specific risks | |||
|- | |||
| Overcrowding | | Overcrowding | ||
| Reduced space in walkways and entrances. Risk of Students panicking because of tight spaces / confinement. Crushing against fixed structures from pushing and shoving. | | Reduced space in walkways and entrances. Risk of Students panicking because of tight spaces / confinement. Crushing against fixed structures from pushing and shoving. |
Revision as of 16:24, 23 September 2017
General risks associated with the SUSU bunfight
Hazard to health and/or safety present | Possible risk to persons & public | Precautions to take | Severity | Likelihood | Risk Level | Action Required, by whom and when? |
---|---|---|---|---|---|---|
Bunfight-specific risks | ||||||
Overcrowding | Reduced space in walkways and entrances. Risk of Students panicking because of tight spaces / confinement. Crushing against fixed structures from pushing and shoving. | A maximum of 3 club/society representatives to be at the stall at any one time; Representatives will not block walkways when engaging with attendees; Early access available to Enabling registered students | M |