Meeting:2013/05/09: Difference between revisions
From SUWS-wiki
Schmendrick (talk | contribs) |
|||
(4 intermediate revisions by 2 users not shown) | |||
Line 16: | Line 16: | ||
* 80m CC Debrief | * 80m CC Debrief | ||
** Noise floor - loop antenna next time? | ** Noise floor - loop antenna next time? | ||
** Extreme narrowband on the Antenna | |||
*** Solution could be a dipole | |||
** Explore the use of the top of the Physics building. helios to follow up. | |||
** Next time, we should use the club rig or shack-in-a-box. | |||
** MORE POWERRRRRR! (Possibly batteries) | |||
** Desk Mics vs. Fist Mics | |||
** Maths tower too noisy! | |||
* WebSDR, globaltuner through uni firewall | * WebSDR, globaltuner through uni firewall | ||
** ASTRA happy to run as a globaltuner if possible | ** ASTRA happy to run as a globaltuner if possible | ||
** Phil is absent :( | |||
* Letter about FT-920 | * Letter about FT-920 | ||
** orchard may have a draft. | ** orchard may have a draft. | ||
** Phil is absent :( | |||
Line 40: | Line 48: | ||
** 6-7th June VHF NFD | ** 6-7th June VHF NFD | ||
*** Partner up with which club? | *** Partner up with which club? | ||
* Field days | |||
** IVARC is organising one and wants people. | |||
** El Pres says we need a vote. | |||
** Wait for more people to be present. (Phil in particular) | |||
Line 55: | Line 69: | ||
** Slim jims? Some still under construction. | ** Slim jims? Some still under construction. | ||
** Dummy Loads | ** Dummy Loads | ||
*** Murray, Henry & Helios ==> Helios to send details to scorpia | |||
** Yagis | ** Yagis | ||
** Schmendrick is interested in designing a CW HF rig. | |||
** Possible dates: | ** Possible dates: | ||
*** After 3YP -- due 1st May | *** After 3YP -- due 1st May | ||
Line 61: | Line 77: | ||
*** When do exams end? -- End of Mayish | *** When do exams end? -- End of Mayish | ||
** Operating afterwards? | ** Operating afterwards? | ||
* '''Submit your availability [http://doodle.com/xun3gpsa926asdht here]''' | |||
* Power Boxes | |||
** Budget | |||
** Schmendrick to figure out how this could be designed. | |||
* FT-920 Case - [http://www.suws.org.uk/File:FT920_Case.jpg Photo] | * FT-920 Case - [http://www.suws.org.uk/File:FT920_Case.jpg Photo] | ||
* AOB | * AOB - NOB | ||
== SOWN == | == SOWN == |
Latest revision as of 18:43, 9 May 2013
<< Meeting 2 May 2013 18:00:00 | Current Event: 9 May 2013 18:00:00 | Meeting 23 May 2013 18:00:00 >>
[[|]] | Current Meeting:
|
[[|]]
Meeting (to be) held from 18:00-20:00 on 2013/05/09 in Zepler CLS Lecture Room
Amateur Radio
18:00-19:00 G3KMI Meeting
- Repeater sites
- Zepler WebSDR+Discone
- Still waiting for ECS to respond - H&S Audit
- 80m CC Debrief
- Noise floor - loop antenna next time?
- Extreme narrowband on the Antenna
- Solution could be a dipole
- Explore the use of the top of the Physics building. helios to follow up.
- Next time, we should use the club rig or shack-in-a-box.
- MORE POWERRRRRR! (Possibly batteries)
- Desk Mics vs. Fist Mics
- Maths tower too noisy!
- WebSDR, globaltuner through uni firewall
- ASTRA happy to run as a globaltuner if possible
- Phil is absent :(
- Letter about FT-920
- orchard may have a draft.
- Phil is absent :(
- Oakley Mast
- Photos
- Very long. Some surface corosion.
- Where would we put it? Store it?
- VHF Contests
- 18-19th May 144MHz May Contest
- 6-7th June VHF NFD
- Partner up with which club?
- Field days
- IVARC is organising one and wants people.
- El Pres says we need a vote.
- Wait for more people to be present. (Phil in particular)
- Generic Operating Day
- Organise on short notice, after 3YP, to account for weather and rig availability.
- Keep an eye on the IRC
- Workshop specifically for AR kit.
- Take a look at the lead acid batteries.
- Building into power boxes?
- RAYNET Battery Box
- Batteries need testing. Sort out the bad ones.
- PowerPole Connectors
- Slim jims? Some still under construction.
- Dummy Loads
- Murray, Henry & Helios ==> Helios to send details to scorpia
- Yagis
- Schmendrick is interested in designing a CW HF rig.
- Possible dates:
- After 3YP -- due 1st May
- After IRP/IRR -- ask orchard
- When do exams end? -- End of Mayish
- Operating afterwards?
- Take a look at the lead acid batteries.
- Submit your availability here
- Power Boxes
- Budget
- Schmendrick to figure out how this could be designed.
- FT-920 Case - Photo
- AOB - NOB
SOWN
19:00-20:00 SOWN Meeting (see agenda)
Joint Agenda
- AOB