Meeting:2013/05/09: Difference between revisions
From SUWS-wiki
Schmendrick (talk | contribs) |
Schmendrick (talk | contribs) |
||
Line 76: | Line 76: | ||
*** When do exams end? -- End of Mayish | *** When do exams end? -- End of Mayish | ||
** Operating afterwards? | ** Operating afterwards? | ||
* '''Submit your availability [http://doodle.com/xun3gpsa926asdht here]''' | |||
Revision as of 18:11, 9 May 2013
<< Meeting 2 May 2013 18:00:00 | Current Event: 9 May 2013 18:00:00 | Meeting 23 May 2013 18:00:00 >>
[[|]] | Current Meeting:
|
[[|]]
Meeting (to be) held from 18:00-20:00 on 2013/05/09 in Zepler CLS Lecture Room
Amateur Radio
18:00-19:00 G3KMI Meeting
- Repeater sites
- Zepler WebSDR+Discone
- Still waiting for ECS to respond - H&S Audit
- 80m CC Debrief
- Noise floor - loop antenna next time?
- Extreme narrowband on the Antenna
- Solution could be a dipole
- Explore the use of the top of the Physics building. helios to follow up.
- Next time, we should use the club rig or shack-in-a-box.
- MORE POWERRRRRR! (Possibly batteries)
- Desk Mics vs. Fist Mics
- Maths tower too noisy!
- WebSDR, globaltuner through uni firewall
- ASTRA happy to run as a globaltuner if possible
- Phil is absent :(
- Letter about FT-920
- orchard may have a draft.
- Phil is absent :(
- Oakley Mast
- Photos
- Very long. Some surface corosion.
- Where would we put it? Store it?
- VHF Contests
- 18-19th May 144MHz May Contest
- 6-7th June VHF NFD
- Partner up with which club?
- Field days
- IVARC is organising one and wants people.
- El Pres says we need a vote.
- Wait for more people to be present. (Phil in particular)
- Generic Operating Day
- Organise on short notice, after 3YP, to account for weather and rig availability.
- Keep an eye on the IRC
- Workshop specifically for AR kit.
- Take a look at the lead acid batteries.
- Building into power boxes?
- RAYNET Battery Box
- Batteries need testing. Sort out the bad ones.
- PowerPole Connectors
- Slim jims? Some still under construction.
- Dummy Loads
- Yagis
- Schmendrick is interested in designing a CW HF rig.
- Possible dates:
- After 3YP -- due 1st May
- After IRP/IRR -- ask orchard
- When do exams end? -- End of Mayish
- Operating afterwards?
- Take a look at the lead acid batteries.
- Submit your availability here
- FT-920 Case - Photo
- AOB
SOWN
19:00-20:00 SOWN Meeting (see agenda)
Joint Agenda
- AOB