Template:RiskAssessment: Difference between revisions

From SUWS-wiki
No edit summary
No edit summary
Line 60: Line 60:


</includeonly>
</includeonly>
 
{{ RiskAssessmentTemplates/Risk Matrix }}
{| class="wikitable" style="margin-left: auto; margin-right: 0px;"
! Risk Evaluation Guide
! Low Severity
! Medium Severity
! High Severity
|-
! Low Likelihood
| style="background-color: yellow;" | L
| style="background-color: yellow;" | L
| style="background-color: lightblue;" | M
|-
! Medium Likelihood
| style="background-color: yellow;" | L
| style="background-color: lightblue;" | M
| style="background-color: red;" | H
|-
! High Likelihood
|  style="background-color: lightblue;" | M
| style="background-color: red;" | H
| style="background-color: red;" | H
|}





Revision as of 15:24, 23 September 2017

This is the "Risk Assessment" template. It should be called in the following format:

{{RiskAssessment
|Title=Risk Assessment
|Event Lead=Members/David Young
|Author=Members/David Young
|Reviewed by=Members/David Young
|Written=2017-09-22
|Reviewed=2017-09-22
|Description=e.g. HF outing to the Common
}}

Additional RA has the format:


{| class="wikitable"
! Hazard to health and/or safety present
! Possible risk to persons & public
! Precautions to take
! Risk Level (Severity x Likelihood).
! Action Required, by whom and when?
|-
|
|
|
| 
| 
|}

Edit the page to see the template text.

Template:RiskAssessmentTemplates/Risk Matrix


Risk Assessment

Hazard to health and/or safety present Possible risk to persons & public Precautions to take Risk Level (Severity x Likelihood). Action Required, by whom and when?
Slips, trips and falls Minor injuries Keep floor areas clear of hazards, ensure cables are appropriately taped down L
Non-ionising radiation Warming of body tissue Antennas are operated above head height. Warning signs are placed nearby L
Manual handling Risk of Musculoskeletal injures, cuts, bruises and crushing. Large/heavy items are carried by two or more people. M
Lead-acid batteries Shorting of contacts could lead to damage to the cells or fire Contacts are taped over for storage and transportation M
Wires temporarily at head height during setup/packdown Risk of injury caused by walking into partially assembled antennas Ensure all club members present are aware of the construction going on L

Additional Risk Assessment