Meeting:2015/05/21: Difference between revisions
From SUWS-wiki
DavidNewman (talk | contribs) (Added initial task list) |
(→Tasks) |
||
Line 30: | Line 30: | ||
* Determining | * Determining parts for ordering | ||
** Possible assignees: craag | ** Possible assignees: craag, Schmendrick, Muzer | ||
** Replacement antenna elemets, hex bolts, mounting kit, coax, etc. | ** Replacement antenna elemets, hex bolts, mounting kit, coax, etc. | ||
** for missing Yagi parts see [[SUSU_Antenna_Array/HF_Yagi]] |
Revision as of 11:17, 20 May 2015
<< Meeting 14 May 2015 18:00:00 | Current Event: 21 May 2015 18:00:00 | Meeting 28 May 2015 18:00:00 >>
[[|]] | Current Meeting:
|
[[|]]
Meeting (to be) held from 18:00-20:00 on 2015/05/21 in Zepler CLS Lecture Room
SUSU Anetenna Array Doing Session
Tasks
- Test Wi-Fi dish works and expected.
- Possible assignee(s): daveruss
- Turn on and connect to web admin interface.
- Test a long-ish distance link. Maybe the length of Salisbury Road
- Will need battery/mains inverter for Wi-Fi dish
- Install new SSD mSata card for APU board
- Possible assignee(s): cmalton, daveruss
- What OS do we want to put on here. There is not need to use OpenWRT now.
- Measurements and CAD drawings for Estates and Facilities guide
- Possible assignees: Scorpia (CAD), Muzer, Henry (Measuremnts)
- Risk Assessment
- Possible assignees: Schmendrick, Scorpia
- Both for deployment and day to day once it is erected.
- Determining parts for ordering
- Possible assignees: craag, Schmendrick, Muzer
- Replacement antenna elemets, hex bolts, mounting kit, coax, etc.
- for missing Yagi parts see SUSU_Antenna_Array/HF_Yagi