Workshop:2/6/2013: Difference between revisions
From SUWS-wiki
Schmendrick (talk | contribs) |
Schmendrick (talk | contribs) |
||
Line 14: | Line 14: | ||
#: PowerPole Connectors | #: PowerPole Connectors | ||
# Slim jims? Some still under construction. | # Slim jims? Some still under construction. | ||
# Dummy Loads | # Dummy Loads -- Deferred until next workshop | ||
#: Murray, Henry & Helios ==> Helios to send details to scorpia | #: Murray, Henry & Helios ==> Helios to send details to scorpia | ||
# Yagis | # Yagis |
Revision as of 18:07, 30 May 2013
<< Meeting 30 May 2013 18:00:00 | Current Event: 2 June 2013 11:00:00 | Meeting 13 June 2013 18:00:00 >>
[[|]] | Current Workshop:
|
[[|]]
Workshop (to be) held from 11:00-17:00 on 2013/06/02 in Access Grid Room
Task list
- Take a look at the lead acid batteries.
- Building into power boxes?
- RAYNET Battery Box
- Batteries need testing. Sort out the bad ones.
- PowerPole Connectors
- Slim jims? Some still under construction.
- Dummy Loads -- Deferred until next workshop
- Murray, Henry & Helios ==> Helios to send details to scorpia
- Yagis
- Schmendrick is interested in designing a CW HF rig.
- Finish letter to G0BBB
- Operating afterwards?
Things Required
- Power Boxes
- Lead Acid Batteries
- sitting in cage
- Anderson Powerpoles
- order has been placed
- Banana Sockets
- Fuse Holders
- Large Wires
- Toolbox
- Lead Acid Batteries
- Yagis
- pvc pipe
- tape measures
- coiax
- conectors
- other hardware