*** Building into power boxes? | *** Building into power boxes? | ||
*** [http://imgur.com/a/y0qru RAYNET Battery Box] | *** [http://imgur.com/a/y0qru RAYNET Battery Box] | ||
*** Batteries need testing. Sort out the bad ones. | |||
*** PowerPole Connectors | |||
** Slim jims? Some still under construction. | ** Slim jims? Some still under construction. | ||
** Possible dates: | ** Possible dates: |
Revision as of 17:33, 25 April 2013
<< Meeting 18 April 2013 18:00:00 | Current Event: 25 April 2013 18:00:00 | Meeting 2 May 2013 18:00:00 >>
[[|]] | Current Meeting:
|
[[|]]
Meeting (to be) held from 18:00-20:00 on 2013/04/25 in Zepler CLS Lecture Room
Amateur Radio
18:00-19:00 G3KMI Meeting
- Repeater sites
- Zepler WebSDR+Discone
- Letter about FT-920
- Oakley Mast
- Photos
- Very long. Some surface corosion.
- Where would we put it? Store it?
- VHF Contests
- 18-19th May 144MHz May Contest
- 6-7th June VHF NFD
- Generic Operating Day
- Organise on short notice, after 3YP, to account for weather and rig availability.
- Keep an eye on the IRC
- Workshop specifically for AR kit.
- Take a look at the lead acid batteries.
- Building into power boxes?
- RAYNET Battery Box
- Batteries need testing. Sort out the bad ones.
- PowerPole Connectors
- Slim jims? Some still under construction.
- Possible dates:
- After 3YP -- due 1st May
- After IRP/IRR -- ask orchard
- When do exams end? -- End of Mayish
- Operating afterwards?
- Take a look at the lead acid batteries.
- FT-920 Case Tyler
- AOB