Meeting:2015/09/24: Difference between revisions

From SUWS-wiki
No edit summary
No edit summary
 
(12 intermediate revisions by the same user not shown)
Line 10: Line 10:


* Mast
* Mast
** We do not have a mast yet
** Situation with b40's demolition, the office situation and the meeting with Director of Union Services explained.
* Storage
* Storage
** Caught up with our stuff being moved from cupboard to cage 9, and etc.
* Outings
* Outings
** Caught up on outing on the common, open days and VHF NFD
* Anything else
* Anything else
** Not that any of us can think of.


=== New year Prep ===
=== New year Prep ===
Line 18: Line 23:
* Things to purchase
* Things to purchase
** [[Kit_wishlist]]
** [[Kit_wishlist]]
*** Deferred until later/Darren is here
** End fed zepp
** End fed zepp
*** Murray to contact G-Whip guy, talk to Graeme first, we could invite him to do a talk on antenna design.


* Bunfights Report
* Emails for freshers


==== Initial Events ====
==== Initial Events ====
* HF vertical on common to test set-up for freshers
** Tentatively Sat 26th Sept.
** [[Outing:2015/09/26|Event page]]


* Introductory sessions.
* Introductory sessions.
** 1st of October
** 1st of October and 8th of October
** Murray and Henry/Russell/any other volunteers on the day to give presentation, Murray to find presentation
** PiSSTV explanation
** General Q&A/topics people would like to know about
** SOWN presentation by Daveruss
** [[Meeting:2015/10/01|Event Page]]
** [[Meeting:2015/10/01|Event Page]]
** [[Meeting:2015/10/08|Event Page]]
** These happened, they went well, I think.


* Freshers outing
* Freshers outing
** 15th of October
** 15th of October
** Intercourse (SUSU grass)
** Later than usual pubbing
** Arrive early (17:30) to help with setup if you can, newbies to arrive 18:00
** Subject to weather
** Light setup, FT-920, large battery, Graeme's end-fed Zepp, Morse's table, red box, Murray's folding chairs.
** Goal is just to make contacts and do greeting message for non-licensees.
** [[Outing:2015/10/15|Event Page]]
** [[Outing:2015/10/15|Event Page]]


* Licence update presentation.
* Licence update presentation.
** 22nd of October
** 22nd of October
** Licence conditions have changed slightly over summer, UGs may not be aware fully.
** Henry to give presentation to explain changes in licence conditions
** Followed by cut-down meeting
** Specifically invite already licenced newbies.
** Obviously existing club members should come too.
** No reminder email for newbie list, but a mention in the previous emails. Obviously reminder on mailing list as usual.
** [[Meeting:2015/10/22|Event Page]]
** [[Meeting:2015/10/22|Event Page]]


* Construction evening/weekend workshop
* Construction evening/weekend workshop
** Murray to send out doodle poll.
** Saturday/Sunday preferred, but perhaps a couple of Thursday doings. Why not both?
** projects to consider
** projects to consider
*** Slimjims
*** Slimjims
*** 10m antennas
*** 10m antennas
*** designing the [[morse sounder]]
*** designing the [[morse sounder]]
*** VFO's for intermediate applicants
*** VFOs for intermediate applicants
** date?
** date?
* SOWN workshop
** Some Saturday towards the end of the month
** Dave to Doodle poll


=== [[SUSU_Antenna_Array|Mast]] ===
=== [[SUSU_Antenna_Array|Mast]] ===
Line 55: Line 79:
=== Exam things ===
=== Exam things ===


* Next dates: Sun 11th Oct 10:00; Mon 7th Dec 19:00; deadlines 18th Sep and 16th Nov respectively.
* Next dates: Mon 7th Dec 19:00 deadline 16th Nov.
** Arthur and Jo{h,}n Fisher would like to Full (either date)
** Arthur and Jo{h,}n Fisher would like to Full (either date).
** Hector and Freddie would like intermediate


=== EMF 2016 ===
=== EMF 2016 ===


* 5th-17th August 2016
* 5th-7th August 2016
** SUWS attendance?
** SUWS attendance?
* Guildford!


=== Kit at [[M0NSA_QTH]] ===
=== Kit at [[M0NSA_QTH]] ===


* pole and other bits should be catalogued and relocated
* pole and other bits should be catalogued and relocated
* Diplexer, many missing bits to HF beam, 40m Softrock SDR, SOWN node
* A load more poles at Dave's house.
* They forgot the HF power amp, I suspect that will come back later
** That hasn't happened yet


=== AOB (radio) ===
=== AOB (radio) ===
* FCC are being literally Satan. They're potentially going to prevent people from using custom firmware on WiFi chipsets.
** Please moan at them: https://www.federalregister.gov/articles/2015/08/06/2015-18402/equipment-authorization-and-electronic-labeling-for-wireless-devices
* 146-147 Mhz NoV renewal  
* 146-147 Mhz NoV renewal  
** http://rsgb.org/main/operating/licensing-novs-visitors/online-nov-application/146mhz-147mhz-nov/
** http://rsgb.org/main/operating/licensing-novs-visitors/online-nov-application/146mhz-147mhz-nov/
** Club would like to apply.
** If you have a full licence, please apply as it should be interesting to experiment with.
* QSL card competition
** Should be officially started after freshers arrive
** Winner gets 25 QSL cards of own design (club gets 75 of winning design)
** Only paid members can {be eligible for prize,vote} (delete as appropriate)
** Rear design in competition as well.


== Joint Agenda ==
== Joint Agenda ==
Line 78: Line 113:
=== Storage ===
=== Storage ===
* Where / what has happened to our Zepler cupboard.
* Where / what has happened to our Zepler cupboard.
** It's gone missing
** There wasn't that much stuff in it but it would be a pain to lose (manuals/original boxes/mounting hardware).
** Bill Swanton who is on leave possibly knows.
** Cupboard has been claimed by someone. We will be getting a new one. Joyce is on it/etc.
* Second key for B32 cupboard.
* Second key for B32 cupboard.
* [[42/Cage9|cage 9]] issues
* [[42/Cage9|cage 9]] issues
** CU and livesoc contacted
** CU and livesoc contacted
** There's a leak in the roof.


=== Social ===
=== Social ===
Line 87: Line 127:
** Now with working lights
** Now with working lights
** suggested date: 29th
** suggested date: 29th
=== AOB ===
==== H&S training ====
* Let's send Arihant, as he handles equipment, and he hasn't already been.
** He couldn't make any of them.
* Freddie volunteered, but he's not on the committee.


== SOWN ==
== SOWN ==
See [[sown:Meetings|SOWN Agenda]]
See [[sown:Meetings|SOWN Agenda]]

Latest revision as of 19:03, 8 October 2015

[[|]] | Current Meeting:

 | 

[[|]]

Meeting (to be) held from 18:00-20:00 on 2015/09/24 in Zepler CLS Lecture Room

 


Catch up of summer news

  • Mast
    • We do not have a mast yet
    • Situation with b40's demolition, the office situation and the meeting with Director of Union Services explained.
  • Storage
    • Caught up with our stuff being moved from cupboard to cage 9, and etc.
  • Outings
    • Caught up on outing on the common, open days and VHF NFD
  • Anything else
    • Not that any of us can think of.

New year Prep

  • Things to purchase
    • Kit_wishlist
      • Deferred until later/Darren is here
    • End fed zepp
      • Murray to contact G-Whip guy, talk to Graeme first, we could invite him to do a talk on antenna design.


Initial Events

  • Introductory sessions.
    • 1st of October and 8th of October
    • Murray and Henry/Russell/any other volunteers on the day to give presentation, Murray to find presentation
    • PiSSTV explanation
    • General Q&A/topics people would like to know about
    • SOWN presentation by Daveruss
    • Event Page
    • Event Page
    • These happened, they went well, I think.
  • Freshers outing
    • 15th of October
    • Intercourse (SUSU grass)
    • Later than usual pubbing
    • Arrive early (17:30) to help with setup if you can, newbies to arrive 18:00
    • Subject to weather
    • Light setup, FT-920, large battery, Graeme's end-fed Zepp, Morse's table, red box, Murray's folding chairs.
    • Goal is just to make contacts and do greeting message for non-licensees.
    • Event Page
  • Licence update presentation.
    • 22nd of October
    • Licence conditions have changed slightly over summer, UGs may not be aware fully.
    • Henry to give presentation to explain changes in licence conditions
    • Followed by cut-down meeting
    • Specifically invite already licenced newbies.
    • Obviously existing club members should come too.
    • No reminder email for newbie list, but a mention in the previous emails. Obviously reminder on mailing list as usual.
    • Event Page
  • Construction evening/weekend workshop
    • Murray to send out doodle poll.
    • Saturday/Sunday preferred, but perhaps a couple of Thursday doings. Why not both?
    • projects to consider
      • Slimjims
      • 10m antennas
      • designing the morse sounder
      • VFOs for intermediate applicants
    • date?
  • SOWN workshop
    • Some Saturday towards the end of the month
    • Dave to Doodle poll

Mast

  • Director of union services discussing with E&F

Exam things

  • Next dates: Mon 7th Dec 19:00 deadline 16th Nov.
    • Arthur and Jo{h,}n Fisher would like to Full (either date).
    • Hector and Freddie would like intermediate

EMF 2016

  • 5th-7th August 2016
    • SUWS attendance?
  • Guildford!

Kit at M0NSA_QTH

  • pole and other bits should be catalogued and relocated
  • Diplexer, many missing bits to HF beam, 40m Softrock SDR, SOWN node
  • A load more poles at Dave's house.
  • They forgot the HF power amp, I suspect that will come back later
    • That hasn't happened yet

AOB (radio)

  • QSL card competition
    • Should be officially started after freshers arrive
    • Winner gets 25 QSL cards of own design (club gets 75 of winning design)
    • Only paid members can {be eligible for prize,vote} (delete as appropriate)
    • Rear design in competition as well.

Joint Agenda

Storage

  • Where / what has happened to our Zepler cupboard.
    • It's gone missing
    • There wasn't that much stuff in it but it would be a pain to lose (manuals/original boxes/mounting hardware).
    • Bill Swanton who is on leave possibly knows.
    • Cupboard has been claimed by someone. We will be getting a new one. Joyce is on it/etc.
  • Second key for B32 cupboard.
  • cage 9 issues
    • CU and livesoc contacted
    • There's a leak in the roof.

Social

  • Artemis
    • In a month where we have five Thursdays.
    • Now with working lights
    • suggested date: 29th

AOB

H&S training

  • Let's send Arihant, as he handles equipment, and he hasn't already been.
    • He couldn't make any of them.
  • Freddie volunteered, but he's not on the committee.

SOWN

See SOWN Agenda