Meeting:2015/05/21: Difference between revisions

From SUWS-wiki
(Added initial task list)
 
 
(4 intermediate revisions by 2 users not shown)
Line 3: Line 3:
|date=2015/05/21
|date=2015/05/21
|endtime=20:00
|endtime=20:00
|enddate=2015/05/14
|enddate=2015/05/21
|location=59/1257
|location=59/1257
}}
}}
Line 9: Line 9:


=== Tasks ===
=== Tasks ===
* Test Wi-Fi dish works and expected.  
 
* Discuss SUSU issues
** potential permission issue with mast
 
 
* Test Wi-Fi dish works as expected.  
** Possible assignee(s):  daveruss
** Possible assignee(s):  daveruss
** Turn on and connect to web admin interface.
** Turn on and connect to web admin interface.
Line 22: Line 27:


* Measurements and CAD drawings for Estates and Facilities guide
* Measurements and CAD drawings for Estates and Facilities guide
** Possible assignees: Scorpia (CAD), Muzer, Henry (Measuremnts)
** Possible assignees: Scorpia (CAD), Muzer, Henry (Measurements)




Line 30: Line 35:




* Determining remaining small parts for ordering
* Determining parts for ordering
** Possible assignees: craag
** Possible assignees: craag, Schmendrick, Muzer
** Replacement antenna elemets, hex bolts, mounting kit, coax, etc.
** Replacement antenna elemets, hex bolts, mounting kit, coax, etc.
** for missing Yagi parts see [[SUSU_Antenna_Array/HF_Yagi]]

Latest revision as of 12:26, 21 May 2015

[[|]] | Current Meeting:

 | 

[[|]]

Meeting (to be) held from 18:00-20:00 on 2015/05/21 in Zepler CLS Lecture Room

 

SUSU Anetenna Array Doing Session

Tasks

  • Discuss SUSU issues
    • potential permission issue with mast


  • Test Wi-Fi dish works as expected.
    • Possible assignee(s): daveruss
    • Turn on and connect to web admin interface.
    • Test a long-ish distance link. Maybe the length of Salisbury Road
    • Will need battery/mains inverter for Wi-Fi dish


  • Install new SSD mSata card for APU board
    • Possible assignee(s): cmalton, daveruss
    • What OS do we want to put on here. There is not need to use OpenWRT now.


  • Measurements and CAD drawings for Estates and Facilities guide
    • Possible assignees: Scorpia (CAD), Muzer, Henry (Measurements)


  • Risk Assessment
    • Possible assignees: Schmendrick, Scorpia
    • Both for deployment and day to day once it is erected.


  • Determining parts for ordering
    • Possible assignees: craag, Schmendrick, Muzer
    • Replacement antenna elemets, hex bolts, mounting kit, coax, etc.
    • for missing Yagi parts see SUSU_Antenna_Array/HF_Yagi