Workshop:2014/02/08: Difference between revisions

From SUWS-wiki
 
(3 intermediate revisions by 2 users not shown)
Line 7: Line 7:
}}
}}
== Task list ==
== Task list ==
* Sown:
** Complete nfcapd/nfsen/softflow setup.
** Complete the twodo list.
** Fix dns name resolving for nodes.
* More inventory taking?
* More inventory taking?
** Sort through kit left by Chris O1


* Makeing slim-jims?
* Building slim-jims?
** Equipment
** Equipment
*** Tape measure
*** Tape measure

Latest revision as of 19:13, 6 February 2014

[[|]] | Current Workshop:

 | 

[[|]]

Workshop (to be) held from 11:00-17:00 on 2014/02/08 in Access Grid Room

 

Task list

  • Sown:
    • Complete nfcapd/nfsen/softflow setup.
    • Complete the twodo list.
    • Fix dns name resolving for nodes.


  • More inventory taking?
    • Sort through kit left by Chris O1
  • Building slim-jims?
    • Equipment
      • Tape measure
      • Soldering iron
      • BNC Crimper?
      • VHF-rig
      • VHF-SWR meter
    • Consumables
      • Cable ties
      • Solder
      • Ribbon Cable (maplin?)
      • Coax
      • Connectors