Workshop:2024/07/14: Difference between revisions
From SUWS-wiki
(Added workshop with task list) |
No edit summary |
||
(5 intermediate revisions by the same user not shown) | |||
Line 4: | Line 4: | ||
|endtime=19:00 | |endtime=19:00 | ||
|enddate=2024-07-14 | |enddate=2024-07-14 | ||
|location=32/ | |location=32/3089 | ||
}} | }} | ||
== Task list == | == Task list == | ||
* Upgrade Authentik | * Upgrade Authentik | ||
* Upgrade Netbox to 4.x | * Upgrade Netbox to 4.x | ||
** Connected services | |||
*** Backups | |||
*** Web page on www.sown.org.uk | |||
*** Ansible | |||
*** Icinga 2 | |||
* Upgrade and/or test Wagtail on SOWN website | |||
* Reconfigure switch-b53 so that servers can be connected through this rather than iSolutions switch. | |||
** Get Netbox to generate the config | |||
** Either manually or automatically apply | |||
* Review checks still needing migrating to monitor2 | * Review checks still needing migrating to monitor2 | ||
* Migrate non- | * Migrate non-critical VMs from vms-b53-1 to vms-b32-1 | ||
* | ** Maybe worth holding off until we get the SSDs to replace the "spinning rust" we have been promised | ||
** May need adapters to fit drives into servers |
Latest revision as of 14:55, 14 July 2024
<< Workshop 21 April 2024 15:00:00 | Current Event: 14 July 2024 15:00:00 | [[|]]
[[|]] | Current Workshop:
|
[[|]]
Workshop (to be) held from 15:00-19:00 on 2024-07-14 in B32 L3 North Server Room
Task list
- Upgrade Authentik
- Upgrade Netbox to 4.x
- Connected services
- Backups
- Web page on www.sown.org.uk
- Ansible
- Icinga 2
- Connected services
- Upgrade and/or test Wagtail on SOWN website
- Reconfigure switch-b53 so that servers can be connected through this rather than iSolutions switch.
- Get Netbox to generate the config
- Either manually or automatically apply
- Review checks still needing migrating to monitor2
- Migrate non-critical VMs from vms-b53-1 to vms-b32-1
- Maybe worth holding off until we get the SSDs to replace the "spinning rust" we have been promised
- May need adapters to fit drives into servers