Template:RiskAssessment/Mains: Difference between revisions

From SUWS-wiki
(Fixed template to not strip first line.)
(Update to 2020 Risk Assessment Format)
 
Line 1: Line 1:
<noinclude>
<noinclude>
Risks associated with the use of mains power outside
Risks associated with the use of mains power outside
{{RiskAssessment/RiskMatrix}}
{{RiskAssessment/RiskMatrix2020}}
{| class="wikitable"
{| class="wikitable"
{{RiskAssessment/Columns}}
{{RiskAssessment/Columns2020}}
</noinclude>
</noinclude>
&#32;
&#32;
! colspan=7 | Mains Power
|-
! colspan="11" | Mains Power
|-
|-
| Mains electricity
| Mains electricity
| Electric shock or electrocution
| Electric shock or electrocution
| Users
| 3
| 5
| 15
| Ensure that mains-powered equipment has recently been safety tested. Ensure that appropriately IP-rated equipment is used for outdoor installations.
| Ensure that mains-powered equipment has recently been safety tested. Ensure that appropriately IP-rated equipment is used for outdoor installations.
| H
| 1
| L
| 5
| M
| 5
|  
|  
|-
<noinclude>
<noinclude>
|}
|}
</noinclude>
</noinclude>
<noinclude>[[Category:Risk Assessment Template]]</noinclude>
<noinclude>[[Category:Risk Assessment Template]]</noinclude>

Latest revision as of 23:33, 29 August 2020

Risks associated with the use of mains power outside

Impact
1 2 3 4 5
Likelihood 1 1 2 3 4 5
2 2 4 6 8 10
3 3 6 9 12 15
4 4 8 12 16 20
5 5 10 15 20 25
Liklihood Description
1 Rare 1 in 100,000 chance
2 Unlikely 1 in 10,000 chance
3 Possible 1 in 1,000 chance
4 Likely 1 in 100 chance
5 Very Likely 1 in 10 chance
Impact Description
1 Trivial/Insignificant Very Minor injuries e.g. slight bruising
2 Minor Injuries or illness e.g. small cut or abrasion which require basic first aid treatment even if self administered
3 Moderate Injuries or Illness e.g. straining or sprain requiring first aid or medical support
4 Major Injuries or illness e.g. broken bones requiring medial support > 24 hours and time off work or study > 4 weeks.
5 Severe/Extremely Significant Fatality or multiple serious injuries or illness requiring hospital admission or significant time off work or study.
Hazard Potential Consequences Persons at Risk Inherent Control Measures Residual Further Controls
Likelihood Impact Score Likelihood Impact Score


Mains Power
Mains electricity Electric shock or electrocution Users 3 5 15 Ensure that mains-powered equipment has recently been safety tested. Ensure that appropriately IP-rated equipment is used for outdoor installations. 1 5 5