Template:RiskAssessment/Mains: Difference between revisions
From SUWS-wiki
DavidNewman (talk | contribs) No edit summary |
DavidNewman (talk | contribs) (Fixed template to not strip first line.) |
||
Line 5: | Line 5: | ||
{{RiskAssessment/Columns}} | {{RiskAssessment/Columns}} | ||
</noinclude> | </noinclude> | ||
  | |||
! colspan=7 | Mains Power | ! colspan=7 | Mains Power | ||
|- | |- |
Revision as of 19:07, 19 September 2019
Risks associated with the use of mains power outside
Risk Evaluation Guide | Low Severity | Medium Severity | High Severity |
---|---|---|---|
Low Likelihood | L | L | M |
Medium Likelihood | L | M | H |
High Likelihood | M | H | H |
Hazard to health and/or safety present | Possible risk to persons & public | Precautions to take | Severity | Likelihood | Risk Level | Action Required, by whom and when? |
---|---|---|---|---|---|---|
Mains Power | ||||||
Mains electricity | Electric shock or electrocution | Ensure that mains-powered equipment has recently been safety tested. Ensure that appropriately IP-rated equipment is used for outdoor installations. | H | L | M |