Workshop:2016/09/24: Difference between revisions

From SUWS-wiki
No edit summary
Line 17: Line 17:


* Cupboard and storage cleanout
* Cupboard and storage cleanout
** 32 level 3 (cupboard)
** '''32 level 3 (cupboard)'''
** '''53 level 3 (cupboard)'''
** '''53 level 3 (cupboard)'''
** 42 level 1 (cage)
** 42 level 1 (cage)
Line 28: Line 28:
** Generally more detailed plans on which radio demos to do
** Generally more detailed plans on which radio demos to do
* Update inventory
* Update inventory
** 32 level 3 (cupboard)
** '''32 level 3 (cupboard)'''
** '''53 level 3 (cupboard)'''
** '''53 level 3 (cupboard)'''
** 42 level 1 (cage)
** 42 level 1 (cage)

Revision as of 18:11, 24 September 2016

[[|]] | Current Workshop:

 | 

[[|]]

Workshop (to be) held from 11:00-17:00 on 2016/09/24 in The Mary Campbell Room

 

A workshop to get everything setup and ready for the next academic year.

Note: This workshop is subject to rearrangement based on availability closer to the date.

Task list

Tasks in Bold are complete

Primary tasks

  • Cupboard and storage cleanout
    • 32 level 3 (cupboard)
    • 53 level 3 (cupboard)
    • 42 level 1 (cage)
    • Dave's garage level 1
      • Has to be done on Saturday
  • Prepare introductory events
    • Intro Presentation
    • Ensure demos (PiSSTV) working
    • Email sign-up dev
    • Generally more detailed plans on which radio demos to do
  • Update inventory
    • 32 level 3 (cupboard)
    • 53 level 3 (cupboard)
    • 42 level 1 (cage)
    • Dave's garage level 1
    • People involved
      • Someone with wiki access
  • Kit testing and maintenance

Secondary Tasks

  • club projects
    • HF Beam
    • PI-SSTV
  • Club laptop building