Workshop:2016/09/24: Difference between revisions
From SUWS-wiki
ThomasKelly (talk | contribs) |
No edit summary |
||
Line 6: | Line 6: | ||
|location=32/4073 | |location=32/4073 | ||
}} | }} | ||
A workshop to get everything setup and ready for the next academic year. | A workshop to get everything setup and ready for the next academic year. | ||
Line 12: | Line 11: | ||
== Task list == | == Task list == | ||
'''Tasks in Bold are complete | |||
=== Primary tasks === | === Primary tasks === | ||
Line 17: | Line 18: | ||
* Cupboard and storage cleanout | * Cupboard and storage cleanout | ||
** 32 level 3 (cupboard) | ** 32 level 3 (cupboard) | ||
** 53 level 3 (cupboard) | ** '''53 level 3 (cupboard)''' | ||
** 42 level 1 (cage) | ** 42 level 1 (cage) | ||
** Dave's garage level 1 | ** '''Dave's garage level 1''' | ||
***Has to be done on Saturday | ***Has to be done on Saturday | ||
* Prepare introductory events | * Prepare introductory events | ||
** Intro Presentation | ** '''Intro Presentation''' | ||
** Ensure demos (PiSSTV) working | ** Ensure demos (PiSSTV) working | ||
** Email sign-up dev | ** Email sign-up dev | ||
** Generally more detailed plans on which radio demos to do | ** Generally more detailed plans on which radio demos to do | ||
* Update inventory | * Update inventory | ||
** 32 level 3 (cupboard) | |||
** '''53 level 3 (cupboard)''' | |||
** 42 level 1 (cage) | |||
** Dave's garage level 1 | |||
**People involved | **People involved | ||
***Someone with wiki access | ***Someone with wiki access | ||
* Kit testing and maintenance | * Kit testing and maintenance | ||
=== Secondary Tasks === | === Secondary Tasks === | ||
Line 49: | Line 41: | ||
** HF Beam | ** HF Beam | ||
** PI-SSTV | ** PI-SSTV | ||
* Club laptop building |
Revision as of 16:03, 24 September 2016
<< Workshop 22 September 2016 18:00:00 | Current Event: 24 September 2016 11:00:00 | Outing 28 September 2016 08:00:00 >>
[[|]] | Current Workshop:
|
[[|]]
Workshop (to be) held from 11:00-17:00 on 2016/09/24 in The Mary Campbell Room
A workshop to get everything setup and ready for the next academic year.
Note: This workshop is subject to rearrangement based on availability closer to the date.
Task list
Tasks in Bold are complete
Primary tasks
- Cupboard and storage cleanout
- 32 level 3 (cupboard)
- 53 level 3 (cupboard)
- 42 level 1 (cage)
- Dave's garage level 1
- Has to be done on Saturday
- Prepare introductory events
- Intro Presentation
- Ensure demos (PiSSTV) working
- Email sign-up dev
- Generally more detailed plans on which radio demos to do
- Update inventory
- 32 level 3 (cupboard)
- 53 level 3 (cupboard)
- 42 level 1 (cage)
- Dave's garage level 1
- People involved
- Someone with wiki access
- Kit testing and maintenance
Secondary Tasks
- club projects
- HF Beam
- PI-SSTV
- Club laptop building