Meeting:2013/04/25: Difference between revisions
From SUWS-wiki
(→Amateur Radio: Spacing.) |
Schmendrick (talk | contribs) |
||
(8 intermediate revisions by 2 users not shown) | |||
Line 13: | Line 13: | ||
* Zepler WebSDR+Discone | * Zepler WebSDR+Discone | ||
** Still waiting for ECS to respond | |||
* Letter about FT-920 | * Letter about FT-920 | ||
** orchard may have a draft. | |||
* Oakley Mast | * Oakley Mast | ||
** [http://imgur.com/a/bFXcV#yEeF2 Photos] | ** [http://imgur.com/a/bFXcV#yEeF2 Photos] | ||
** Very long. Some surface corosion. | |||
** Where would we put it? Store it? | |||
* HF Contests | * HF Contests | ||
** [http://www.rsgbcc.org/hf/rules/2013/r80mcc.shtml 80m CC] | ** [http://www.rsgbcc.org/hf/rules/2013/r80mcc.shtml 80m CC] | ||
** 6th May and 20th June for SSB see [http://www.rsgbcc.org/cgi-bin/hfreadcal.pl?year=2013 calendar] for other dates. | |||
* VHF Contests | * VHF Contests | ||
** 18-19th May [http://www.rsgbcc.org/cgi-bin/contest_rules.pl?year=2013&contest=may144 144MHz May Contest] | ** 18-19th May [http://www.rsgbcc.org/cgi-bin/contest_rules.pl?year=2013&contest=may144 144MHz May Contest] | ||
** 6-7th June VHF NFD | ** 6-7th June VHF NFD | ||
* Generic Operating Day | |||
** Organise on short notice, after 3YP, to account for weather and rig availability. | |||
** Keep an eye on the IRC | |||
Line 35: | Line 44: | ||
*** Building into power boxes? | *** Building into power boxes? | ||
*** [http://imgur.com/a/y0qru RAYNET Battery Box] | *** [http://imgur.com/a/y0qru RAYNET Battery Box] | ||
*** Batteries need testing. Sort out the bad ones. | |||
*** PowerPole Connectors | |||
** Slim jims? Some still under construction. | ** Slim jims? Some still under construction. | ||
** Possible dates: | ** Possible dates: | ||
Line 44: | Line 55: | ||
* FT-920 Case [[User:TylerWard|Tyler]] | * FT-920 Case [[User:TylerWard|Tyler]] | ||
** Tyler's been displaced. | |||
** Graeme has a spare flight case and is happy to provide a shelf. | |||
** cmalton to provide image [http://www.suws.org.uk/File:FT920_Case.jpg here] | |||
* AOB | * AOB | ||
** GB4FUN application submitted to the RSGB | |||
== SOWN == | == SOWN == |
Latest revision as of 17:48, 25 April 2013
<< Meeting 18 April 2013 18:00:00 | Current Event: 25 April 2013 18:00:00 | Meeting 2 May 2013 18:00:00 >>
[[|]] | Current Meeting:
|
[[|]]
Meeting (to be) held from 18:00-20:00 on 2013/04/25 in Zepler CLS Lecture Room
Amateur Radio
18:00-19:00 G3KMI Meeting
- Repeater sites
- Zepler WebSDR+Discone
- Still waiting for ECS to respond
- Letter about FT-920
- orchard may have a draft.
- Oakley Mast
- Photos
- Very long. Some surface corosion.
- Where would we put it? Store it?
- VHF Contests
- 18-19th May 144MHz May Contest
- 6-7th June VHF NFD
- Generic Operating Day
- Organise on short notice, after 3YP, to account for weather and rig availability.
- Keep an eye on the IRC
- Workshop specifically for AR kit.
- Take a look at the lead acid batteries.
- Building into power boxes?
- RAYNET Battery Box
- Batteries need testing. Sort out the bad ones.
- PowerPole Connectors
- Slim jims? Some still under construction.
- Possible dates:
- After 3YP -- due 1st May
- After IRP/IRR -- ask orchard
- When do exams end? -- End of Mayish
- Operating afterwards?
- Take a look at the lead acid batteries.
- FT-920 Case Tyler
- Tyler's been displaced.
- Graeme has a spare flight case and is happy to provide a shelf.
- cmalton to provide image here
- AOB
- GB4FUN application submitted to the RSGB
SOWN
19:00-20:00 SOWN Meeting (see agenda)
Joint Agenda
- AOB